DUMP TRAILER Electrical power UNIT

DUMP TRAILER Energy UNIT- SINGLE ACTING
General Description
This electrical power unit includes a power up gravity down circuit. Start out the motor to lengthen the cylinder and activate the solenoid valve to retract the circuit. Manual override to solenoid valve can be offered if demanded. Also a stress compen sated flow management can be additional to your circuit to control the descent velocity in the cylinder.
Remark: Please check with our sales engineer to the distinctive pump displacement, motor electrical power or tank capacity.
Exclusive Notes
1. This electrical power unit is of S3 duty cycle, i.e., non-continuous operation, 30 seconds on and 270 seconds off.
2. Clean all the hydraulic elements concerned ahead of installation of the power unit.
3. Viscosity in the hydraulic oil shoud be 15~46 cst,which should really also be clean and absolutely free of impurities.N46 hydraulic oil is suggested.
4. The electrical power unit should be mounted horizontally.
5. Check the oil degree inside the tank after the original working of your power unit.
six. Oil transforming is needed following the original a hundred operation hours, afterwards the moment just about every 3000 hrs.

DUMP TRAILER Energy UNIT-DOUBLE ACTING
Basic Description
This energy unit features a energy up energy down circuit with load holding on both A & B ports. A stress compensatred movement control may be additional to circuit to regulate the decent pace in the cylinder.
Distinctive Notes
1. This power unit is of S3 duty cycle, i.e., non-continuous operation, thirty seconds on and 270 seconds off.
2. Clean each of the hydraulic parts concerned just before installation of the electrical power unit.
three. Viscosity in the hydraulic oil shoud be 15~46 cst, which need to also be clean and free of charge of impurities. N46 hydraulic oil is recommended.
four. The power unit should be mounted horizontally.
five. Check the oil level while in the tank following the preliminary working in the energy unit.
6. Oil transforming is needed following the first 100 operation hrs, afterwards the moment every 3000 hours.

Tags: