PN10 PP Fitting Tee Coupling Compression Fitting Male Threaded Tee for Irrigation System

Overview

Swift Information

Area of Origin:

Zhejiang, China

Manufacturer Identify:

EPT

Design Number:

R2004

Technics:

Casting

Link:

Male

Shape:

Equal

Head Code:

Round

Solution identify:

Male Threaded Tee

Application:

Water Source

Stress:

PN10

Regular:

DIN Normal

Certificate:

ISO9001 CE

Measurement:

20-110MM

Medium:

Water

Packaging & Shipping

Marketing Models:
Single product
Single bundle dimension:
48X38X38 cm
Single gross excess weight:
fifteen.000 kg
Lead Time
:
Quantity(Pieces) 1 – 1000 >1000
Est. Time(days) three To be negotiated

On-line Customization

Movie Description

Description code measurement pcs/carton
Male Threaded Tee R2004 twenty*1/2 280
20*3/four 260
twenty*1 260
25*one/two one hundred sixty
twenty five*3/4 160
25*one 160
32*1/two 88
32*three/four 88
32*1 88
40*one 64
forty*one one/four sixty four
40*one 1/two 64
40*two sixty
50*1 one/four 35
50*1 one/2 35
50*2 35
63*one one/4 18
63*1 1/2 eighteen
63*2 eighteen
seventy five*two 9
75* two one/2 nine
75*three 9
90*2 1/2 five
90*three 5
90*4 5
110*three 4
one hundred ten*4 four

1. Are you a manufacture or buying and selling business ?

We are nicely-know company for irrigation technique in the world with a lot more than 20 a long time industry expertise. The predecessor of our firm is NINGBO KEXING PIPE INDUSTRIAL CO.,LTD. which is dedicated to pipe systems.

2. Do you offer you OEM service ?

Indeed. Our products based mostly on the IRRIPLAST Brand. We offer you the OEM services, with the same top quality. Our R&ampD crew will design and style the merchandise according to the buyer&rsquos necessity.

three. what&rsquos your MOQ ?

Our MOQ is5 Cartons for one particular sort.

four. What is your supply time ?

The irriplast model leadtime is about 15 days.

The OEM services direct time is about 30 days.

five. What is your payment terms ?

30 T/T deposit ,70% just before shipping /copy of the B/L / Letter of Credit rating.

6. What is the area of your organization?

Found in NINGBO , ZHEJIANG, CHINA.

It takes 2.five several hours from Shanghai to our firm by fast practice.

It will take 2.5 several hours from Guangzhou to our organization by air.

7. How to get a sample ?

We would despatched you the sample for free and the freight is gathered.

Tags: coupling