IRRIPLAST BRAND HOT SALE CHINA MANUFACTURER PN16 PP COMPRESSION FITTINGS FOR IRRIGATION PP COUPLING ADAPTOR

Overview

Fast Details

Place of Origin:

Zhejiang, China

Manufacturer Name:

EPT

Product Number:

1003

Technics:

Casting

Link:

drive

Form:

Equivalent

Head Code:

Spherical

Application:

Coupling

Packaging & Shipping

Offering Units:
One item
One bundle size:
48X38X38 cm
One gross fat:
15.000 kg
Direct Time
:
Quantity(Parts) 1 – a thousand >1000
Est. Time(times) 3 To be negotiated

On the web Customization

Content:

Component

Substance

Human body(A)

Heterophasic block polypropylene co-polymer(PP-B) of

extraordinary mechanical qualities even at substantial temperature.

Blocking bush(D)

Polypropylene

Nut(B)

Polypropylene with dye grasp of large stability

to UV rays andsolidity to warmth( S grade according to standard DIN54004)

Clinching ring(C)

Polyacetal resin(POM)with high mechanical resistance

And hardness

O Ring gasket(E)

Special elastomeric acrylonitrile rubber(EPDM) for alimentary use

Reinforcing ring

AISI 430 (UNI X8Cr17,W,nr 14828)Stainless metal for woman threads from 1&rdquoto four&rdquo

1. Are you a manufacture or trading firm ?

We are effectively-know maker for irrigation system in the world with much more than 20 years market encounter. The predecessor of our firm is NINGBO KEXING PIPE INDUSTRIAL CO.,LTD. which is fully commited to pipe techniques.

two. Do you supply OEM service ?

Yes. Our merchandise based on the IRRIPLAST Brand name. We offer the OEM services, with the very same good quality. Our R&ampD crew will design the item according to the customer&rsquos need.

3. what&rsquos your MOQ ?

Our MOQ is5 Cartons for 1 variety.

4. What is your supply time ?

The irriplast band leadtime is around fifteen days.

The OEM support guide time is around 30 days.

five. What is your payment conditions ?

30 T/T deposit ,70% prior to supply /copy of the B/L / Letter of Credit history.

6. What is the location of your business?

Situated in NINGBO , ZHEJIANG, CHINA.

It normally takes two.5 hrs from Shanghai to our company by quick practice.

It requires two.five several hours from Guangzhou to our company by air.

seven. How to get a sample ?

We would sent you the sample for free and the freight is gathered.

Tags: coupling